The construction of the cogeneration plant is the most significant project of the Kazakh-Romanian Energy Investment Fund (FIEKR), and it is a crucial pillar for both the Petromidia refinery and the national energy system. The complex industrial project was built in about 3 years.

Eastship was a logistic partner for this project, handling all details of the deliveries: unloading on modular trailers or specialised semi trailers, temporary storage on elephant legs, engineering, load calculations, lashing plans, detailed route surveys, permits and police escorts.

We handled multiple oversize transports for this project, the bigger piecesmeasuring up to 15.46 m in length, 6.05width,: 5.47 height and weighed 195 tons.

Weight: 195 tons

Length: 15.46 m

Width: 6.05 m

Height: 5.47 m

Long term predictability and reliability

Inside engineering

Sufficient staff to attend multiple truck loads and barge operations simultaneously