Iernut Autoclaved Aerated Concrete (AAC) factory project
As part of the Iernut Autoclaved Aerated Concrete (AAC) factory project in Romania, Eastship provided autoclave transport and on-site logistics services for seven industrial autoclaves in 2024. The seven autoclaves were transported over a distance exceeding 700 kilometres as part of the logistics requirements for the new AAC production facility. Each autoclave measured 24 meters in length, 3.3 meters in height, 3 meters in width, weighed 45 tons. Autoclave Transport The tran


300-Tonne Fractionator Transport to Petrobrazi Refinery: From Route Engineering to Final Positioning
Transporting oversized industrial equipment is rarely defined by distance alone. The complexity lies in the engineering required to move the cargo safely through existing infrastructure and deliver it to its final installation area. This was the case with the transportation of a 300-tonne fractionator manufactured by Walter Tosto WTB and delivered from Bucharest to the Petrobrazi Refinery in Romania. The road journey covered approximately 210 kilometres, but the project requi


Kostolac B Thermal Power Plant
700,000 Freight tons Duration: 7 years >25 millions km by truck >700 000 km by barge Kostolac B Thermal Power Plant is an ongoing 697 MW coal-fired power project located in Branicevo, Serbia. The project has been developed in multiple phases and is expected to achieve stable operation on the grid in September 2023. Since 2016, Eastship has been a key logistics partner in the power plant’s construction, delivering around 700,000 freight to the site in Serbia, over 25 million k


Factory relocation Project
The project encompassed the transport of various cargo, including gantry cranes, girders, steam boilers, flying buckets, panels, and air compressors, efficiently packed in ninety 40’ OT/Flat Racks. Notably, oversize cargo pieces measuring 28-32 meters, like gantry cranes and girders, were also part of the consignment. Our team met with the Port authorities to take special approval from concerned authorities for priority berthing. To ensure the special transport was handled sa