top of page


Porto nogaro
We were contracted to pick up four heavy reactors from a port in Italy, a location that presented significant logistical challenges due to the absence of any suitable heavy lifter capable of reaching the site. This particular port, known for its limited access points and difficult terrain, required a carefully crafted approach to ensure the safe and efficient handling of heavy equipment transport. In less than one day, our dedicated logistics team conducted a thorough analysi


HVT transport to Nuclear Power Plant
In 2022, Eastship Projects & Logistics successfully completed the transportation of two high voltage transformers for the Cernavodă Nuclear Power Plant, one of Romania's critical energy infrastructure facilities. The project involved the movement of heavy electrical equipment under a highly restrictive delivery schedule, requiring careful coordination, detailed engineering, and the integration of multiple transport modes. With a delivery window of only three days, conventiona


L.N.G. Tanks
This was one of the most challenging transportation projects Eastship`s team has ever faced. We were entrusted with the transportation of two massive tanks to the VARD shipyard in Tulcea. The tanks weighed a staggering 366 tons each and measured 28 metres in length, 15 metres in width, and 12 metres in height. The first challenge was to find a barge that could transport the tanks from Constanta and transport them to Tulcea. However, the Tulcea dock posed a unique challenge. T


Transport of the Largest Pressurized Vessel Ever Built in Romania
Industrial infrastructure developments demand highly specialized engineering and rigorous route planning, particularly when transporting record-breaking components across international corridors. Eastship Projects & Logistics managed the complete end-to-end transport of the largest pressurized vessel ever built in Romania. This high-tonnage component was delivered as a critical asset for the Midor Oil Refinery Expansion Project located in Egypt. Project Specifications & Heavy


Barge Transport & Transshipment of Industrial Boilers
When seasonal low-water levels on the Danube River threatened a critical heavy-lift timeline, Eastship's engineering team deployed specialized shallow-draft solutions to safely transport three 364-ton industrial units. Discover how precise draft calculations, short-notice fleet mobilization, and a direct vessel-to-vessel transhipment of big boilers at the Port of Constanta kept this 1,092-ton global supply chain project moving smoothly toward Doha, Qatar.


Centimeters to Spare: A Complex Reactor Barge Operation
In the world of project logistics and oversize transport, no two voyages are identical. Every cargo presents unique structural dimensions, and every waterway introduces its own variables. Out of the numerous barge operations executed each year, one recent project highlighted exactly how critical technical precision becomes when physical space is at an absolute premium. The objective: transport two industrial reactors of massive magnitude. While moving cargo of this scale alwa
bottom of page