HVT transport to Nuclear Power Plant
In 2022, Eastship Projects & Logistics successfully completed the transportation of two high voltage transformers for the Cernavodă Nuclear Power Plant, one of Romania's critical energy infrastructure facilities. The project involved the movement of heavy electrical equipment under a highly restrictive delivery schedule, requiring careful coordination, detailed engineering, and the integration of multiple transport modes. With a delivery window of only three days, conventiona


Rompetrol Cogeneration Plant
The construction of the cogeneration plant is the most significant project of the Kazakh-Romanian Energy Investment Fund (FIEKR), and it is a crucial pillar for both the Petromidia refinery and the national energy system. The complex industrial project was built in about 3 years. Eastship was a logistic partner for this project, handling all details of the deliveries: unloading on modular trailers or specialised semi trailers, temporary storage on elephant legs, engineering,


Iernut Power Plant
As part of the Iernut project in 2024, Eastship transported seven autoclaves over a distance exceeding 700 kilometers. Each autoclave measured 24 meters in length, 3.3 meters in height, 3 meters in width, weighed 45 tons. For the internal movement at beneficiary’s premises, we have used a tailor made system engineered, built and operated by our crew. We designed and constructed robust trolleys, each capable of supporting 45 tons, and mounted them on rails. The autoclaves we


Vidraru Dam Upgrade Project: Complex On-Site Logistics in a Challenging Mountain Environment
Hydropower infrastructure projects are among the most demanding undertakings in the industrial sector. They require a perfect alignment of engineering expertise, specialized equipment, and calculated execution—especially when the site is a historic engineering marvel built into a steep mountain face. For the landmark Vidraru Dam upgrade project, Eastship was employed by Electromontaj to handle the high-stakes on-site offloading, maneuvering, and precision foundation placement