Factory relocation Project
The project encompassed the transport of various cargo, including gantry cranes, girders, steam boilers, flying buckets, panels, and air compressors, efficiently packed in ninety 40’ OT/Flat Racks. Notably, oversize cargo pieces measuring 28-32 meters, like gantry cranes and girders, were also part of the consignment. Our team met with the Port authorities to take special approval from concerned authorities for priority berthing. To ensure the special transport was handled sa


How Eastship Delivered the "Moles" Modernizing Romania's Railways
Discover how our project logistics team executed the complex, 500 km oversize transport of massive Tunnel Boring Machines (TBMs) from Constanța Port through the narrow mountain passes of the Prahova Valley (DN1). Learn how meticulous route planning and specialized heavy-lift engineering safely delivered the critical equipment shaping the future of the Sighișoara-Brașov high-speed railway line.