Multimodal Transport of LNG Tanks and Ship Engines
Eastship Projects & Logistics coordinated a complex project cargo and multimodal transport operation involving the maritime discharge, direct vessel-to-barge transshipment, inland waterway transportation, and final Ro/Ro (Roll-on/Roll-off) discharge of four oversized industrial units. With a total combined weight of nearly 1,000 tonnes, this Out-of-Gauge (OOG) shipment required an engineered logistics plan. By combining direct heavy-lift crane transshipment with specialized R


Rompetrol Cogeneration Plant
The construction of the cogeneration plant is the most significant project of the Kazakh-Romanian Energy Investment Fund (FIEKR), and it is a crucial pillar for both the Petromidia refinery and the national energy system. The complex industrial project was built in about 3 years. Eastship was a logistic partner for this project, handling all details of the deliveries: unloading on modular trailers or specialised semi trailers, temporary storage on elephant legs, engineering,