top of page


Rompetrol Cogeneration Plant
The construction of the cogeneration plant is the most significant project of the Kazakh-Romanian Energy Investment Fund (FIEKR), and it is a crucial pillar for both the Petromidia refinery and the national energy system. The complex industrial project was built in about 3 years. Eastship was a logistic partner for this project, handling all details of the deliveries: unloading on modular trailers or specialised semi trailers, temporary storage on elephant legs, engineering,


Iernut Power Plant
As part of the Iernut project in 2024, Eastship transported seven autoclaves over a distance exceeding 700 kilometers. Each autoclave measured 24 meters in length, 3.3 meters in height, 3 meters in width, weighed 45 tons. For the internal movement at beneficiary’s premises, we have used a tailor made system engineered, built and operated by our crew. We designed and constructed robust trolleys, each capable of supporting 45 tons, and mounted them on rails. The autoclaves we


Transport of the Largest Pressurized Vessel Ever Built in Romania
Industrial infrastructure developments demand highly specialized engineering and rigorous route planning, particularly when transporting record-breaking components across international corridors. Eastship Projects & Logistics managed the complete end-to-end transport of the largest pressurized vessel ever built in Romania. This high-tonnage component was delivered as a critical asset for the Midor Oil Refinery Expansion Project located in Egypt. Project Specifications & Heavy
bottom of page