top of page


Multimodal Transport of LNG Tanks and Ship Engines
Two LNG storage tanks measuring approximately 32 metres in length and weighing around 300 tonnes each were part of a much larger industrial shipment coordinated by Eastship Projects & Logistics. The operation involved seven oversized industrial units, with a combined weight of approximately 1,700 tonnes, transported from the Port of Constanța to Tulcea. Alongside the two tanks, the shipment included five heavy industrial engines, each requiring handling arrangements suited to


How Eastship Delivered the "Moles" Modernizing Romania's Railways
Discover how our project logistics team executed the complex, 500 km oversize transport of massive Tunnel Boring Machines (TBMs) from Constanța Port through the narrow mountain passes of the Prahova Valley (DN1). Learn how meticulous route planning and specialized heavy-lift engineering safely delivered the critical equipment shaping the future of the Sighișoara-Brașov high-speed railway line.
bottom of page











