Multimodal Transport of LNG Tanks and Ship Engines
Two LNG storage tanks measuring approximately 32 metres in length and weighing around 300 tonnes each were part of a much larger industrial shipment coordinated by Eastship Projects & Logistics. The operation involved seven oversized industrial units, with a combined weight of approximately 1,700 tonnes, transported from the Port of Constanța to Tulcea. Alongside the two tanks, the shipment included five heavy industrial engines, each requiring handling arrangements suited to


Delivering 50 Structural Beams from Italy to Romania
.Moving one 14-metre structural beam is one transport operation. Moving 50 of them, in sequence, across international borders is a project logistics challenge. For a major viaduct project in the Mureș region of Romania, Eastship is coordinating the transport of 50 structural beams from Verona, Italy. Each beam is approximately 14 meters long and 3 meters high. International transport, planned around the project The beams travel by specialised road transport from Italy to Roma


HVT transport to Nuclear Power Plant
In 2022, Eastship Projects & Logistics successfully completed the transportation of two high voltage transformers for the Cernavodă Nuclear Power Plant, one of Romania's critical energy infrastructure facilities. The project involved the movement of heavy electrical equipment under a highly restrictive delivery schedule, requiring careful coordination, detailed engineering, and the integration of multiple transport modes. With a delivery window of only three days, conventiona
bottom of page