Multimodal Transport of LNG Tanks and Ship Engines
Two LNG storage tanks measuring approximately 32 metres in length and weighing around 300 tonnes each were part of a much larger industrial shipment coordinated by Eastship Projects & Logistics. The operation involved seven oversized industrial units, with a combined weight of approximately 1,700 tonnes, transported from the Port of Constanța to Tulcea. Alongside the two tanks, the shipment included five heavy industrial engines, each requiring handling arrangements suited to


High Voltage Transformer Transport: Moving 250 Tons Across 600 Km
You don't see logistics when you switch on the lights. Behind every reliable power grid is a journey few people ever see. Eastship Projects & Logistics recently transported a 250-tonne high voltage transformer over more than 600 kilometres, using a 26-axle modular trailer. Moving equipment of this scale requires more than sufficient transport capacity. The entire operation is engineered around the cargo dimensions, axle loads, centre of gravity and route infrastructure. Route
bottom of page