Multimodal Transport of LNG Tanks and Ship Engines
Two LNG storage tanks measuring approximately 32 metres in length and weighing around 300 tonnes each were part of a much larger industrial shipment coordinated by Eastship Projects & Logistics. The operation involved seven oversized industrial units, with a combined weight of approximately 1,700 tonnes, transported from the Port of Constanța to Tulcea. Alongside the two tanks, the shipment included five heavy industrial engines, each requiring handling arrangements suited to


Managing Recurring Oversized Transport for Infrastructure Projects Across Europe
Predictability is one of the most important deliverables in project logistics. For the A1 motorway project in Romania, Eastship is managing the recurring transport of 16-metre structural beams from Italy to Romania — a logistics programme covering almost 2,000 kilometres and four countries. The cargo itself is only part of the challenge. One transport programme. Four countries. The route crosses Italy, Slovenia, Hungary and Romania, with each country bringing its own permit p


High Voltage Transformer Transport: Moving 250 Tons Across 600 Km
You don't see logistics when you switch on the lights. Behind every reliable power grid is a journey few people ever see. Eastship Projects & Logistics recently transported a 250-tonne high voltage transformer over more than 600 kilometres, using a 26-axle modular trailer. Moving equipment of this scale requires more than sufficient transport capacity. The entire operation is engineered around the cargo dimensions, axle loads, centre of gravity and route infrastructure. Route


Delivering 50 Structural Beams from Italy to Romania
.Moving one 14-metre structural beam is one transport operation. Moving 50 of them, in sequence, across international borders is a project logistics challenge. For a major viaduct project in the Mureș region of Romania, Eastship is coordinating the transport of 50 structural beams from Verona, Italy. Each beam is approximately 14 meters long and 3 meters high. International transport, planned around the project The beams travel by specialised road transport from Italy to Roma


HVT transport to Nuclear Power Plant
In 2022, Eastship Projects & Logistics successfully completed the transportation of two high voltage transformers for the Cernavodă Nuclear Power Plant, one of Romania's critical energy infrastructure facilities. The project involved the movement of heavy electrical equipment under a highly restrictive delivery schedule, requiring careful coordination, detailed engineering, and the integration of multiple transport modes. With a delivery window of only three days, conventiona


Rompetrol Cogeneration Plant
The construction of the cogeneration plant is the most significant project of the Kazakh-Romanian Energy Investment Fund (FIEKR), and it is a crucial pillar for both the Petromidia refinery and the national energy system. The complex industrial project was built in about 3 years. Eastship was a logistic partner for this project, handling all details of the deliveries: unloading on modular trailers or specialised semi trailers, temporary storage on elephant legs, engineering,


Barge Transport & Transshipment of Industrial Boilers
When seasonal low-water levels on the Danube River threatened a critical heavy-lift timeline, Eastship's engineering team deployed specialized shallow-draft solutions to safely transport three 364-ton industrial units. Discover how precise draft calculations, short-notice fleet mobilization, and a direct vessel-to-vessel transhipment of big boilers at the Port of Constanta kept this 1,092-ton global supply chain project moving smoothly toward Doha, Qatar.


Centimeters to Spare: A Complex Reactor Barge Operation
In the world of project logistics and oversize transport, no two voyages are identical. Every cargo presents unique structural dimensions, and every waterway introduces its own variables. Out of the numerous barge operations executed each year, one recent project highlighted exactly how critical technical precision becomes when physical space is at an absolute premium. The objective: transport two industrial reactors of massive magnitude. While moving cargo of this scale alwa


How Eastship Delivered the "Moles" Modernizing Romania's Railways
Discover how our project logistics team executed the complex, 500 km oversize transport of massive Tunnel Boring Machines (TBMs) from Constanța Port through the narrow mountain passes of the Prahova Valley (DN1). Learn how meticulous route planning and specialized heavy-lift engineering safely delivered the critical equipment shaping the future of the Sighișoara-Brașov high-speed railway line.